Google rating :Google 4.9(51 reviews)
- RBQ licence verified
- Septic tank installation
A house that is not connected to a municipal sewer needs its own waste water treatment system. Installing one follows regulated steps: site study, municipal permit, construction and backfill.
Find a company by city
The regulation requires a permit from the municipality before building a waste water disposal or treatment system. The application includes, among other things, a site characterization study and a location plan. Your municipal planning department can tell you which documents to provide.
The type of system depends on the site: soil type, slope, depth of bedrock and groundwater. The professional who carries out the site characterization study recommends the solution suited to the property.
Ask for the contractor’s RBQ licence number and check in the public registry that it holds subclass 2.4, Private sewerage systems. A clear quote lists the components installed, the excavation work and how the site will be restored.
Ask which documents you will receive at the end of the work and keep them with the permit. They are useful for maintenance, pumping and when selling the property.
Google rating :Google 4.9(51 reviews)
Val-des-Monts
Google rating :Google 5.0(37 reviews)
Saint-Édouard-de-Maskinongé
Saint-Alphonse-Rodriguez
Yes. The regulation requires a municipal permit before building, modifying or moving a waste water treatment system. Contact your municipality about the process.
The site characterization study, signed by a professional, is the basis for choosing the system. The municipality then checks that the project complies with the regulation.
Waste water treatment work for buildings falls under RBQ subclass 2.4, Private sewerage systems. The Régie du bâtiment du Québec registry lets you check a licence.
Add or update your listing for free and get requests from customers in your area.
List my business